Mebane Wastewater Treatment Plant Evaluation, City of Eden, NC

WK Dickson developed a preliminary engineering report evaluating potential improvements to the 13.5 MGD plant, which was originally constructed in 1967. Our recommendations include installation of the Clean B Solution, an innovative new biosolids stabilization process that offers low operations cost, low odors, more rapid stabilization (10-12 minutes vs 30-45 days), enhanced dewatering, and lower capital costs. This is the first permitted use of the Clean B system in NC.